Amur Gas Chemical Complex Project - 1
CLİENT |
Sibur LLC |
CONTRACTOR |
Innova Construction Group |
SUBCONTRACTOR |
Megaron Construction |
SECTOR |
Petrochemicals |
LOCATION |
Amur Oblast / Russia |
PROJECT DURATION |
August 2023 – April 2024 |
PROJECT DESCRIPTION
The capacity of the complex will be 2.7 million tons of finished products per year. The proposed OPF facilities are designed to supply energy resources to technological facilities, receipt and storage of raw materials and intermediate products of technological facilities, collection and treatment of sewage and rainwater, as well as water supply of the Complex. Ethane, propane and butane, the raw materials of the pyrolysis unit at the Amur Gas Chemical Complex, will be produced at the Amur Gas Processing Plant, which is part of Gazprom PJSC.
Capacity: 2.700.000 Ton/Year Polypropylene Production Capacity
SCOPE OF WORK
- Pipe Manufacturing: 17.000 WDI
- Precast Assembly: 1.700 m3
- Painting Sandblasting: 7.000 m2
- Total Number of Staff: 300