Megaron

About operating in the design and engineering, purchasing, manufacturing, assembly, module, construction, operation and commissioning, operation and maintenance, project management processes in Oil, Gas & Petrochemical, Mining Enterprises, Power Plants, Infrastructure and Building Projects on a national and international scale. was established as.

Desktop Menu Image

Megaron; It aims to achieve sustainable and lasting success in its sector by accumulating the information it has obtained and taking one step forward with its business method.

Amur Gas Chemical Complex Project - 1

CLİENT Sibur LLC
CONTRACTOR Innova Construction Group
SUBCONTRACTOR Megaron Construction
SECTOR Petrochemicals
LOCATION Amur Oblast / Russia
PROJECT DURATION   August 2023 – April 2024
 

PROJECT DESCRIPTION

The capacity of the complex will be 2.7 million tons of finished products per year. The proposed OPF facilities are designed to supply energy resources to technological facilities, receipt and storage of raw materials and intermediate products of technological facilities, collection and treatment of sewage and rainwater, as well as water supply of the Complex. Ethane, propane and butane, the raw materials of the pyrolysis unit at the Amur Gas Chemical Complex, will be produced at the Amur Gas Processing Plant, which is part of Gazprom PJSC.

Capacity: 2.700.000 Ton/Year Polypropylene Production Capacity


SCOPE OF WORK
  • Pipe Manufacturing: 17.000 WDI
  • Precast Assembly: 1.700 m3
  • Painting Sandblasting: 7.000 m2
  • Total Number of Staff: 300